FEES & CHARGES |
|
Right-of-Way Utilization Permits
|
- Inspection of utilization of right-of-way:
- Longitudinal cuts:
- basic fee $100.00 plus $5.00 per 100 feet or fraction thereof
- Transverse cuts:
- Open cut - paved areas (each cut):
- cut greater than 50 square feet - $300.00
- cut 50 square feet or less - $100.00
- Open cut - unpaved areas (each cut) - $100.00
- Bore and jack (each operation) - $200.00
- Overhead utilities
- Installation of poles (other than repair/maintenance) - $75.00 plus $2.00 per pole
- Inspection of curb cuts (driveway):
- Residential driveway - $50.00
- Commercial - first driveway. (Fee is waived if site inspection fee is applicable. No fees for curb cut in State of Florida or Orange County right-of-way jurisdiction.) - $400.00 per driveway
- Construction of road and other subdivision improvements on public rights-of-way dedicated to the public on recorded plats, the development of which is not governed by current subdivision regulations - 2.00% of the total construction cost of ALL committed improvements for which no other permits apply.
- Miscellaneous inspections for construction on public property - 2.00% of the total construction cost for any other construction over, through or upon public property not covered by any other fees. Minimum fee - $110.00
- Landscape permit for residential street - $10.00 per 100 feet
- Re-inspections
- Any re-inspection on same item - $150.00
| Fees imposed in this schedule are waived when the permit holder
is required to relocate improvements within the right-of-way due
to construction or reconstruction of any road by the City and
such relocation takes place in conjunction with said
construction. Similarly, fees will be waived whenever utilities
are placed in the right-of-way during and in conjunction with
the construction or reconstruction of any road by the City. All
references herein to "right-of-way" refers to the streets,
rights-of-way and easements for which a right-of-way utilization
permit is required by Article I and Chapter 153 of the Ocoee
City Code. |
| |
|
Capital Charges |
- Water $1,804.00 per ERU
- Sewer $5,350.00 per ERU
|
| |
| Intent to Annex for Utility Services:
Administrative Cost $100.00 |
| Capital Charges for consumers
outside City limits |
- Water $1,758.00 plus 15% as per City Code Chapters 173 & 174
- Sewer $5,213.00 plus 15% as per City Code Chapters 173 & 174
- Plus construction costs and any other fees including permitting fees from Orange County to cross an Orange County Road.
|
|
|
|
|
|
Water, Sewer and Reuse (City Code, 173 & 174) 3% of construction
cost |
|
|
|
Infrastructure Construction (not including water, sewer and
reuse) $3.50 per $1,000.00 of construction cost |
|
|