Downtown Gravity Sewer System

Total cost is yet to be determined but we have allocated $950,000 from the utility bond funds. This project will construct the sanitary sewer (wastewater) collection system that will serve the downtown area. The gravity system will be connected to the wastewater force main at the existing City Hall Campus lift station. Initial construction will provide a basic backbone system; some portions of the system will be built as warranted by development.

General Fund Capital Bond Construction Schedule


Extended construction time reflects initial core system construction and subsequent pipeline installation as part of several roadway projects.